RESUME
|
Gholam
Reza |
: |
Name |
|
Ziaie |
: |
Surname |
|
1946 (1325) |
: |
Birth Date |
|
(1) B.S. degree in chemistry from Ferdoasi university, 1969 (2) B.S. degree in petrochemical engineering from Abadan Oil university (Abadan Institute of Technology, AIT), 1976 (3)
Certificate on Project management, Planing, & Control from Industrial Management Society. (4)
Certificate on General Management (Managing Human Resources), from |
|
Education |
|
32 years |
: |
Total Works Experience |
|
|
: |
Experiences |
|
Tondok Engineering Company, Managing Director |
: |
2002 – Present time |
|
The Oil Industries Engineering & Construction Corporation (OIEC) Project Manager of Acetic Acid Plant, which is Executing as an “EP” Project. This contract is awarded to a consortium consisting of OIEC and LG Engineering & Construction Corporation (LG E&C). OWNER Fanavaran Petrochemical Company (a subsidiary of NPC). |
|
2001-2002(1380-1381) |
|
Oil
Industries Engineering & Construction Corporation (OIEC). Experiences and
positions as fallow: |
: |
1990-2001(1369-1380 ) |
|
a)
Deputy of project manager of works and services for this project was defined as detail engineering Of Distillation units. b) Project manager for design review of Khorasan Petrochemical Project. Ammonia & Urea plants of this fertilizer complex were designed by Kellog Engineering company. c) Project manager of the ninth refinery project. A basic package was developed for a complete condensate refinery including license and non-license units. The license units were designed in accordance with UOP licensee. d) Deputy of project manager for construction and mechanical erection of Khorasan Petrochemical project. Several contracts were awarded to OIEC including : Mechanical
erection of 1500 metric tons per day urea plant, under ground piping network, cooling tower & water treatment plant civil works, mechanical erection of raw water unit, natural gas feed line, area paving & etc. e)
Project manager of projects were executed by OIEC in this complex. The first one was mechanical erection of water treatment plants including raw water, physical treatment(osmosis), filtration, chemical treatment and demineralization. The second one was mechanical erection of Ethyl Benzene and mono Styrene plants. f) Executional Deputy of projects Director. Planning & controlling and execution of the following projects: Mechanical erection of gas injection plant (CS-600). Mechanical erection of gas injection plant (CS-700). Construction (civil works and mechanical erection) of NGL plant (NGL-1500). Mechanical erection of gas compression station (S1). Mechanical erection of gas compression station (S2). g) Executional Manager of petrochemical projects, following the final situation of strategic development of petrochemical industries, and taking necessary actions such as participating to the tenders, Negotiation with the licensors, financers and foreign partners. Cost estimation, preparation of proposals, & etc. |
|
|
|
|
: |
1987-1990(1366-1369 |
|
Tarh-o-Palayesh(T.O.P), a consultant
engineering company, Technical department. |
: |
1984-1987(1363-1366 |
|
N.P.C , Razy Chemical Complex. Last Position: Senior process Engineer of two Urea and Two Ammonia plants. |
: |
1976-1984(1355-1363) |
|
National Petrochemical Company (NPC), AIT |
: |
1973-1976(1352-1355) |
|
Ministry of Education as chemistry teacher |
: |
1971-1973(1350-1352) |