CONSTRUCTION
Civil
Building & Roads & Walls
All Buildings Include Industries & unindustries
Stone Walls & Fence
Excavation & Back Fill
Gravelling
Asphalting
Foundations
Main Equipment
Concrete Slabs
Duct Banks
Septic
Pipe Sleepers
Box Culvert
Miscellaneous
Steel Structure
Shelters Steel Structure Fabrication & Erection
QA/QC Forms
For above Mentioned activities QC Approval Forms shall be Prepared by Construction Contractor & Approved by Clients
HVAC
Installation of HVAC equipment
Erection and Alignment
Testing
Filling QC approval forms
Ducting
Duct Fabrication
Duct Installations
Duct Insulation
Diffuser & Register Installation
Piping & Plumbing Systems
Piping and Plumbing Installation
Testing
Filling QC approval forms for Test
Painting
Insulation & cladding
Final Approvals
Mechanical
Mechanical Group in Construction Projects Included :
Technical Offices :
Fixed Equipment
Rotary Equipment
Piping System
Painting and Insulation
Technical Offices Duties:
Delivery Project Document and Drawings from Archive
Study on project document, DWGS and Prepared Nonconformity Report (NCR)
Prepared Material Issued voucher (MIV)
Material Control According to Project DWGS
Arrange and Control Construction Item With Construction Group
Prepared As Built DWG & Balance Material Status
Installation Groups:
Equipment Installation Group
Piping Installation Group
Painting and Insulation Group
Installation Groups Duties :
A- Equipment :
Installation Group
Visual Inspection of equipment Foundation
Foundation Padding
Anchor Bolts Adjustment
Testing
Erection of equipment
Alignment
Leveling
Grouting
Filling QA/QC Forms
Hydro Static Test Groups
Document Preparation
Testing
Filling QA/QC Forms
Purge & Drying
QC Approval for Drying
B - Piping :
Installation Group
Sand Blast & Primer Coating
Fabrication of Pipe (Bevel/Fit Up /Tack weld /Full Weld) According ISO DWGS.
Installation Piping spools & Field Welding
Fabrication & Installation of piping support
Radiography of welded Joints
Filling QC Approval Forms
Hydro Static Test
Document Preparation (Loop Package)
Loop Package Approval, release for Testing
Testing
QC Approval for Testing
Purge and Drying
QC Approval for drying
Painting and Insulation
Final Painting
Thickness Measurement & QC approval
Insulation & Cladding
QC Approval
Loop Package Final Approval
Electrical
Visual Inspection /material and equipment Delivery
LV/MV Panel & Distribution Board Installation
PMS Panel Installation
Capacitor Bank Installation
Electrical Equipment Installation
Cable Tray & Ladder Installation
Conduit Layout Installation
Conduit Fixing
Cable Laying
Cable Fixing
Cable Shoe Installation
Termination
Bus Duct Support Making
Bus Duct Installation
Earthing Installation
Earth Pit
Earthing Bar
Cad Weld
Cable Laying
Termination
Earthing Test Link
Surge Arrestor
Lighting
Cable Laying and Termination
Flood lighting
Fluorescent and Incandescent
Street Lighting
Explosion Proof Lighting
Aircraft Warning Light Installation
Transformer Installation
UPS & DC Chargers & Batteries
DC Charger Installation
Cable Laying
Battery and Rack Installation
UPS Installation
Electrical Heat Tracing
Cable Laying
Panels
Test
Emergency Gas/Diesel Engine Generator Installation
Panel Installation
Daily Tank Installation
Cabling & Termination
Protection Equipment Test
Telecommunication System Installation
Weather Proof & Ex Telephone Set Installation
Sounder & Intercom Installation
Flash Beacon
Central Exchange Cabinet Installation
Master Call Station Installation
MDBF Installation
Telephone Center Installation
CCTV Installation
Cathodic System Installation
Anode Bed Installation
Trans/Rectifier Installation
Cabling
Test Point Installation
Junction Box, Socket, Welding, Receptacle, LCS & Plug Installation
Instrument & Control
Control Room Equipments :
Installation of :
Systems Cabinets
Work Stations
Panels
Cable Laying
Installation
Classification of cables
Cable Fixing (Tie Rap)
Clamping
Test
Cable Tray / Ladder
Installation
Q/C Approval
Grounding Network
Earthing Pit (Making)
Rod Erection
Cad Welding
Cable Laying
Cable Fixing
Test
Field Instruments :
Cable Tray & Ladder
Installation
Q/C Approval
Cable Installation
Cable Laying
Calssification of cables
Cable fixing (Tie Rap)
Calmping
Test
Instruments Installation
Installation of Hook-Ups
Installation of the Instruments
Installation of Junction Boxes
Test & Calibration
Test
Calibration
Q/C Approval
Documentation
Loop Checking
Cold Test (N.L.T)
Hot Test (Voltage test)
Q/C Approval
Documentation
Packages
Cabling
Installation
Test
Loose Items Installation
Q/C Approval
Documentation
Tubing
Tube Supports
Tube Fixing
Tube Glanding
Test
Grounding
Installation
Test