CONSTRUCTION

Civil

Building & Roads & Walls

All Buildings Include Industries & unindustries

Stone Walls & Fence

Excavation & Back Fill

Gravelling

Asphalting

Foundations

Main Equipment

Concrete Slabs

Duct Banks

Septic

Pipe Sleepers

Box Culvert

Miscellaneous

Steel Structure

Shelters Steel Structure Fabrication & Erection

QA/QC Forms

For above Mentioned activities QC Approval Forms shall be Prepared by Construction Contractor & Approved by Clients

HVAC

Installation of HVAC equipment

Erection and Alignment

Testing

Filling QC approval forms

Ducting

Duct Fabrication

Duct Installations

Duct Insulation

Diffuser & Register Installation

Piping & Plumbing Systems

Piping and Plumbing Installation

Testing

Filling QC approval forms for Test

Painting

Insulation & cladding

Final Approvals

Mechanical

Mechanical Group in Construction Projects Included :

Technical Offices :

Fixed Equipment

Rotary Equipment

Piping System

Painting and Insulation

Technical Offices Duties:

Delivery Project Document and Drawings from Archive

Study on project document, DWGS and Prepared Nonconformity Report (NCR)

Prepared Material Issued voucher (MIV)

Material Control According to Project DWGS

Arrange and Control Construction Item With Construction Group

Prepared As Built DWG & Balance Material Status

Installation Groups:

Equipment Installation Group

Piping Installation Group

Painting and Insulation Group

Installation Groups Duties :

A- Equipment :

Installation Group

Visual Inspection of equipment Foundation

Foundation Padding

Anchor Bolts Adjustment

Testing

Erection of equipment

Alignment

Leveling

Grouting

Filling QA/QC Forms

Hydro Static Test Groups

Document Preparation

Testing

Filling QA/QC Forms

Purge & Drying

QC Approval for Drying

B - Piping :

Installation Group

Sand Blast & Primer Coating

Fabrication of Pipe (Bevel/Fit Up /Tack weld /Full Weld) According ISO DWGS.

Installation Piping spools & Field Welding

Fabrication & Installation of piping support

Radiography of welded Joints

Filling QC Approval Forms

Hydro Static Test

Document Preparation (Loop Package)

Loop Package Approval, release for Testing

Testing

QC Approval for Testing

Purge and Drying

QC Approval for drying

Painting and Insulation

Final Painting

Thickness Measurement & QC approval

Insulation & Cladding

QC Approval

Loop Package Final Approval

Electrical

Visual Inspection /material and equipment Delivery

LV/MV Panel & Distribution Board Installation

PMS Panel Installation

Capacitor Bank Installation

Electrical Equipment Installation

Cable Tray & Ladder Installation

Conduit Layout Installation

Conduit Fixing

Cable Laying

Cable Fixing

Cable Shoe Installation

Termination

Bus Duct Support Making

Bus Duct Installation

Earthing Installation

Earth Pit

Earthing Bar

Cad Weld

Cable Laying

Termination

Earthing Test Link

Surge Arrestor

Lighting

Cable Laying and Termination

Flood lighting

Fluorescent and Incandescent

Street Lighting

Explosion Proof Lighting

Aircraft Warning Light Installation

Transformer Installation

UPS & DC Chargers & Batteries

DC Charger Installation

Cable Laying

Battery and Rack Installation

UPS Installation

Electrical Heat Tracing

Cable Laying

Panels

Test

Emergency Gas/Diesel Engine Generator Installation

Panel Installation

Daily Tank Installation

Cabling & Termination

Protection Equipment Test

Telecommunication System Installation

Weather Proof & Ex Telephone Set Installation

Sounder & Intercom Installation

Flash Beacon

Central Exchange Cabinet Installation

Master Call Station Installation

MDBF Installation

Telephone Center Installation

CCTV Installation

Cathodic System Installation

Anode Bed Installation

Trans/Rectifier Installation

Cabling

Test Point Installation

Junction Box, Socket, Welding, Receptacle, LCS & Plug Installation

Instrument & Control

Control Room Equipments :

Installation of :

Systems Cabinets

Work Stations

Panels

Cable Laying

Installation

Classification of cables

Cable Fixing (Tie Rap)

Clamping

Test

Cable Tray / Ladder

Installation

Q/C Approval

Grounding Network

Earthing Pit (Making)

Rod Erection

Cad Welding

Cable Laying

Cable Fixing

Test

Field Instruments :

Cable Tray & Ladder

Installation

Q/C Approval

Cable Installation

Cable Laying

Calssification of cables

Cable fixing (Tie Rap)

Calmping

Test

Instruments Installation

Installation of Hook-Ups

Installation of the Instruments

Installation of Junction Boxes

Test & Calibration

Test

Calibration

Q/C Approval

Documentation

Loop Checking

Cold Test (N.L.T)

Hot Test (Voltage test)

Q/C Approval

Documentation

Packages

Cabling

Installation

Test

Loose Items Installation

Q/C Approval

Documentation

Tubing

Tube Supports

Tube Fixing

Tube Glanding

Test

Grounding

Installation

Test