Procurement
Procurement Plan
Planning Split of Supply :
Study of Specification :
Construction
Design Condition ( Pressure, Temperature, etc. )
Prinicipal Materials
Procurement Condition
Study of Importability and availability :
Negative list
Availability in Iran
Planning Vendor list :
Iranian Suppliers
Foreign Countries’ Suppliers
Establish Procurement Schedule.
Establishment Of Procurement Procedure
Establishing Inquiry Procedure
Establishing Bid Analysis Procedure
Establishing Expediting Procedure
Establishing Inspection Procedure
Establishing Packing and shipping Procedure
Establishing Vendor Documentation Procedure
Preparation For Inquiry
Establishing General Purchase Conditions
Establishing Requisition Standard Form
Request For Quotation
Preparing Inquiry Package Consisting of :
Request for quotation
Terms and condition of purchase
Scope of supply
Delivery Condition
Technical requisitions including data sheets, engineering drawings, inspection
requirements, etc.
Shipping and packing instructions
Requirement of documents
Price form
Issuing Inquiry Documents :
To Iranian Vendors
To foreign Countries’ Vendors
Collection of Quotations :
Expediting
Receiving
Evaluation Of Quotation
Technical Evaluation :
Compliance with Specifications, drawings & data Technical quality (efficiency,
reliability, suitability, operation cost, etc.)
Experience in manufacturing similar materials or supplies
Reliability for the execution of Contract including delivery schedule judging from shop
capacity
Spare parts availability and recommendation
Lubricant oil recommendation
Generate and warranty
Commercial Evaluation :
Quoted price and condition
Financial standing
Vendor Selection
Order Placement
Purchase Order Commitment :
Confirmation of conditions to be committed
Placing Order :
Issue of purchase order package
Receiving acknowledgement by vendor of purchase order
Reporting of procurement Status
Expediting
Kick Off Meeting
Contact Point
Confirmation of “ Technical Requirement”
Schedule (V/P Material)
Expediting Meeting
Vendor’s Prints issue schedule
Manufacturing and Fabricating Schedule & sequence
Packing & Shipping Schedule
Shipping Documents
Reporting
Expediting Status
Receiving & approving status of vendor’s Print
Inspection
Review of Purchase Order
Inspection requirement
Schedule
QC Coordination Meeting
Confirmation of inspection requirement
Inspection Schedule
Pre-Production /Pre-Inspection meeting for critical equipments with vendors
Checking and Approval of Vendor’s QC Procedure
QC Procedure
Witness item
Welding procedure specification
Welder’s and welding procedure qualification
NDE application and procedure
Heat treatment procedure
Running /Performance test procedure
Inspection, Examination and Testing
Review and evaluation of materials test certificate
Verification of welder’s and welding procedure qualification
Witnessing NDE and pressure test
Witnessing positive material identification for alloy elements
Witnessing special process, if any
Operational and/or functional checking
Inspection of general workmanship and dimensional conformity
Inspection of painting /coating/rust prevention
Inspection of shipping preparation
Preparing Inspection Certificate with Inspection Record
Reporting
Inspection
Follow Up
Coordinate with Engineering and construction Department as required
Take necessary action for Overage, shortage, and damage (OS&D) of Delivered Equipment and Materials
OS&D Status Report
Arrange Mechanical and Vendor Data Book
Payment to Vendor
Contract of Vendor’s Technical Personnel Dispatch
Arrange Dispatch of Vendor’s Technical Personnel